HANGAR BASE MILITAR

MILITARY BASE HANGAR

BIM modelling for specialised aeronautical infrastructure.

This project consisted of the development of the BIM model for the Detailed Design of a helicopter hangar at a military base in Spain.

The scope included the multidisciplinary modelling of architecture, structure and MEP systems, reaching a level of development of LOD 300. This enabled precise coordination between the different disciplines and provided a solid technical basis for the construction phase. Based on the digital model, a complete set of 230 drawings was generated, structured and managed in accordance with ISO 19650 criteria, forming the detailed design documentation required for the start of construction.

CLIENT: CONFIDENTIAL

AREA: 6000 M²

LOCATION: SPAIN

SERVICE: MULTIDISCIPLINARY BIM MODELLING, DETAILED DESIGN DEVELOPMENT, ARCHITECTURE, STRUCTURE AND MEP COORDINATION, TECHNICAL DOCUMENTATION PRODUCTION, INFORMATION MANAGEMENT IN ACCORDANCE WITH ISO 19650 STANDARDS

About us

We integrate architecture, management and innovation to develop projects with strategic vision and technical precision.We work from concept through execution, coordinating multidisciplinary teams and supporting our clients at every stage of the process, with the goal of creating sustainable value and long-lasting results.

WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY
WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY