BENALMÁDENA STATION

Scan-to-BIM to document, coordinate, and improve an existing railway infrastructure.

The Benalmádena Station project focused on improving the functionality, accessibility, and urban integration of an existing railway infrastructure.

The intervention included the reorganization of vertical circulation cores, the expansion and redistribution of the lobby, the renovation of the passenger building, and the optimization of the platforms, with the goal of improving passenger flows, user experience, and the station’s relationship with its urban surroundings.

IMPAR developed an LOD 300 As-Built model based on the point cloud survey. The scope included architectural, structural, and MEP modeling, multidisciplinary BIM coordination, clash detection, and the production of As-Built drawings.

CLIENT: CONFIDENTIAL

AREA: 2.116,4 M²

LOCATION: MÁLAGA, SPAIN

SERVICE: LOD 300 AS-BUILT MODEL FROM POINT CLOUD, ARCHITECTURAL, STRUCTURAL, AND MEP MODELING, MULTIDISCIPLINARY COORDINATION, CLASH DETECTION, AND AS-BUILT DRAWINGS.

About us

We integrate architecture, management and innovation to develop projects with strategic vision and technical precision.We work from concept through execution, coordinating multidisciplinary teams and supporting our clients at every stage of the process, with the goal of creating sustainable value and long-lasting results.

WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY
WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY