LANTANIA

LANTANIA

BIM modelling for high-precision railway infrastructure.

This project involved the BIM development of an overpass on the Palencia section, with an approximate length of 1.3 km, aimed at optimising technical coordination and construction accuracy for the infrastructure.

The model was developed to LOD 350, enabling detailed control of the project’s various systems. The scope included the modelling of reinforcing steel, the optimisation of the drainage system and electrical installations, as well as the design of embankments and cross sections to ensure structural stability and proper integration with the railway line.

Through the BIM methodology, coordination between disciplines and the quality of the technical documentation were improved, ensuring efficient execution and long-lasting infrastructure.

CLIENT: LANTANIA

LENGTH: 1.3 KM

LOCATION: SPAIN

SERVICE: BIM MODELLING LOD 350, REINFORCING STEEL MODELLING, INFRASTRUCTURE COORDINATION, DRAINAGE AND ELECTRICAL INSTALLATIONS DEVELOPMENT, EMBANKMENT AND CROSS-SECTION DESIGN

About us

We integrate architecture, management and innovation to develop projects with strategic vision and technical precision.We work from concept through execution, coordinating multidisciplinary teams and supporting our clients at every stage of the process, with the goal of creating sustainable value and long-lasting results.

WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY
WHO WE ARE WHAT WE DO HOW WE WORK OUR CLIENTS TEAM CORPORATE SOCIAL RESPONSIBILITY